
Service NL-01Framing takeoff & material packages
Your plans, priced as a framing package
Send the drawing set you bid from. Our estimating team measures it, builds the framing material list, prices the package, and flags the lead times, before your bid is due rather than after.
Sec 01What you get back
The package, on paper first
Every takeoff comes back as a document set you can put straight into a bid, and straight into a purchase order when you win it.
Framing material list
Quantities organized by level and assembly (floor systems, walls, roof, headers, posts) with lengths, grades, and counts your crew can check against the set.
Package quote
Current market pricing on the full package, itemized so you can see where the money is, and where a substitution could save it.
Lead-time flags
LVL, PSL, and special-order items are called out with realistic lead times, so long-lead material never ambushes your schedule.
Delivery plan
Loads staged by phase (first-floor deck, walls, second deck, roof) and coordinated with your framing schedule and your site's reality.
Sec 02Scope of takeoff
What the takeoff covers
Full structural framing scope for wood-frame residential and multifamily construction, from single homes to podium buildings.
| Assembly | Included items | Notes |
|---|---|---|
| Floor framing | Joists, I-joists, rim board, sill plates & sealer, girders, blocking, bridging, subfloor sheathing, adhesives | Per level, with hanger schedule |
| Wall framing | Precut studs, plates, headers, king & jack studs, corners, backing, fire blocking, wall sheathing | Exterior & interior, by floor |
| Roof framing | Rafters, ridge, valley & hip members, collar ties, sub-fascia, roof sheathing, H-clips | Stick-framed; truss packages quoted with supplier |
| Beams & posts | LVL, PSL, built-up beams, columns, structural posts, flitch plates | Sized from structurals; lead times flagged |
| Hardware | Joist hangers, hurricane ties, hold-downs, post bases & caps, straps, structural screws, nails | Counted to the connector schedule |
| Exterior shell | Housewrap, seam tape, flashing accessories on request | Optional add-on to the framing package |
Sec 03Process
From upload to first delivery
-
Send the set
Upload plans through the site or email them. Architecturals plus structurals is ideal; we'll tell you right away if a sheet is missing.
Day 0 · PDF, CAD, or clear photos -
Scope call
A short call to confirm what's yours: framing only or shell, who supplies hardware, what the schedule looks like, how the site receives loads.
Usually same or next business day -
Takeoff & pricing
We measure the set with professional takeoff software, build the list by assembly, and price it against current market numbers.
Target: 2–3 business days by scope -
Review together
You get the list and quote to mark up. We walk it with you, adjust specs or substitutions, and lock the package.
Your engineer of record has final say on structure -
Order & stage deliveries
Approve the package and we schedule deliveries by phase (decks, walls, roof) so material lands when the crew needs it.
All of Rhode Island · broader New England by arrangement
Sec 04Straight talk
What's automated. What isn't.
You'll see "AI takeoffs" promised all over the industry. Here's where we actually are: every National Lumber takeoff today is run by people , estimators using professional takeoff software, because your bid deserves numbers somebody stands behind.
The National Lumber Online platform in development will automate the busywork around it: uploads, status, revisions, approvals, ordering, delivery windows. As automated measurement earns its place, it gets added with human checks, not instead of them.
- Today: plan intake through this site, human takeoff, package quote, delivery coordination
- In development: project dashboard, revision tracking, one-click reorder, delivery scheduling
- Earning its place: software-assisted measurement, checked by an estimator before it reaches you
Sec 05Questions contractors ask
Framing takeoff FAQ
What does the takeoff cost?
Nothing. The takeoff and quote are how we earn the material order. There's no obligation. If our number doesn't work, keep the list.
How fast will I get it?
Our target is 2–3 business days for a typical single-family or small multifamily set. Larger or unusual scopes can take longer. We'll give you a date on the scope call, and if your bid is due sooner, say so and we'll tell you honestly whether we can hit it.
What plan formats do you take?
PDF is the workhorse. CAD files help when you have them. Clean photos of a printed set work for smaller jobs. If pages are missing or unreadable, we flag it the same day rather than guessing.
How long is the quote good for?
Lumber moves. Every quote states its validity window on the sheet, and if the market shifts before you order, we re-price the affected lines and show you what changed. No silent adjustments.
Do you do delivery?
Yes. Deliveries are coordinated to jobsites across Rhode Island, staged by phase where the site allows. Broader New England by arrangement on package size.
What if the plans change mid-job?
Send the revision cloud. We re-run the affected assemblies, mark what changed in the list, and price the delta, so change orders are documented instead of argued.
Can you size beams or engineer the structure?
We quote and supply what your structural drawings call for, and we'll flag anything that looks off. Structural design and final sizing stay with your engineer of record. We don't play engineer, and you shouldn't want a supplier who does.
Put a set in front of us.
The fastest way to find out if we're your materials partner is one real takeoff on one real project.

