Field log NL-03Projects
From the field
Construction our team documents across Rhode Island and New England: framing stages, dried-in shells, and finished buildings. This is the work the packages are built for.
Set 01Multifamily · framing stage
Wood frame, three stories up
Garden-style multifamily at full framing tempo: open stud walls, floor systems landing, sheathing going on, packages staged where the telehandler can reach them.
Free takeoff · target 2 to 3 business days.
Set 02Multifamily · drone survey
The whole site, from above
Drone passes over a garden-style community mid-build: one building at raw framing, the next wrapped, the last one roofed. Three phases of the same package, in one frame.
Set 03Mixed-use · podium construction
Four stories over parking
Wood frame over a structural podium, built through a New England winter: sheathing panels taped, windows in, brick veneer rising behind the snow piles.
All photography & footage: actual jobsites, Rhode Island & New England region
Your project belongs up here.
Send the plans for the next one. We'll bring the package.
